Research of Bunch Lengthening of BEPC Ring by Many-Particle Simulation
- Received Date: 1900-01-01
- Accepted Date: 1900-01-01
- Available Online: 1996-10-05
Abstract: By many-particle simulation, longitudinal instability of BEPC ring is analysed and dependence of bunch length on single beam current and the threshold current are given.Simulation results go well with the measurement results.





Abstract
HTML
Reference
Related
PDF












DownLoad: