General Design of the CSR Project in IMP

Get Citation
XIA Jia-Wen, ZHAN Wen-Long, WEI Bao-Wen, YUAN You-Jin and SONG Ming-Tao. General Design of the CSR Project in IMP[J]. Chinese Physics C, 2006, 30(4): 335-343.
XIA Jia-Wen, ZHAN Wen-Long, WEI Bao-Wen, YUAN You-Jin and SONG Ming-Tao. General Design of the CSR Project in IMP[J]. Chinese Physics C, 2006, 30(4): 335-343. shu
Milestone
Received: 2005-05-18
Revised: 1900-01-01
Article Metric

Article Views(3158)
PDF Downloads(674)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

General Design of the CSR Project in IMP

    Corresponding author: XIA Jia-Wen,
  • Institute of Modern Physics, Chinese Academy of Sciences, Lanzhou 730000, China

Abstract: CSR, a new accelerator project under the construction to upgrade the existing heavy ion cyclotron system in Lanzhou, is a double cooling-storage-ring system. It consists of a main ring and an experimental ring. The heavy ion beams from the cyclotron system will be accumulated and accelerated first in the main ring, then extracted to produce radioactive ion beams or high-Z beams, and finally to be send to the second ring for internal-target experiments.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return