-
Abstract:
The physical design and beam test for the BPL 35.5MeV beam transport system are described. This system was constructed and put into operation into operation in December 1986. After preliminary adjustment, the beam transfer efficiency of the two beam lines of this system reached 88% and 93% respectively.
-
-
References
[1]
|
周清一等, 高能物理与核物理, 11(1987),85.[2] 魏开煌等, BPL/TRAN. 83-01, 中国科学院高能物理研究所内部报告, 1983.[3] 魏开煌等, BPL/TRAN.87-O 1, 中国科学院高能物理研究所内部报告, 1987,[4] 吕继华等, 1 OMe V能谱测量线扩充为1 OMe V通用束流测量线的初步理论设计, 中国科学院高能物理研究所内部报告, 1978.
|
-
[1] |
GUO Yun-Jun
, HE Kang-Lin
. Muon Identification Using the Efficiencies Ratio Method at BESⅡ. Chinese Physics C,
2007, 31(11): 1050-1055. |
[2] |
HUANG Wen-Xue
, WANG Yue
, ZHU Zhi-Chao
, TIAN Yu-Lin
, XU Hu-Shan
, SUN Zhi-Yu
, XIAO Guo-Qing
, ZHAN Wen-Long
. Experimental Study of the High-Voltage Breakdown and Simulations for the RFQ Cooler and Buncher RFQ1L. Chinese Physics C,
2006, 30(S2): 261-264. |
[3] |
HU Xi-Duo
, SHAO Ming-Zhu
, LUO Shi-Yu
, LIU Yong-Sheng
, ZHU De-Hai
. Average Field Idea and Single Particle Model for 2 Dimension Crystallization Beams(Ⅱ). Chinese Physics C,
2004, 28(2): 196-199. |
[4] |
PENG Quan-Ling
, SUN Jian
, ZHAO Guang-Yuan
, SHI Cai-Tu
. Principle and Software Design of Helmhotz Coil Measurement System. Chinese Physics C,
2001, 25(9): 920-925. |
[5] |
Li Yangguo
. Antiproton -Nucleus Charge Exchange Reaction and Inelastic Scattering. Chinese Physics C,
1996, 20(11): 1021-1027. |
[6] |
Xu Jianming
. Matching Problem of Lattice with Transverse Coupling. Chinese Physics C,
1995, 19(1): 73-81. |
[7] |
WANG Man
, LI Jin
, CUI Xiang-Zong
, XIA Xiao-Mi
, LAI Yuan-Fen
, YAO Xiao-Guang
. PROTOTYPE OF END CAP SHOWER COUNTERAND ITS BEAM TEST. Chinese Physics C,
1987, 11(3): 321-326. |
-
Access
-
-