Construction and Commissioning of HLS Injection Bump System

Get Citation
SHANG Lei, WANG Xiang-Qi, WANG Lin, JIA Dao-Man and ZHAO Feng. Construction and Commissioning of HLS Injection Bump System[J]. Chinese Physics C, 2006, 30(2): 159-162.
SHANG Lei, WANG Xiang-Qi, WANG Lin, JIA Dao-Man and ZHAO Feng. Construction and Commissioning of HLS Injection Bump System[J]. Chinese Physics C, 2006, 30(2): 159-162. shu
Milestone
Received: 2005-06-14
Revised: 2005-08-08
Article Metric

Article Views(2916)
PDF Downloads(567)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Construction and Commissioning of HLS Injection Bump System

    Corresponding author: SHANG Lei,
  • National Synchrotron Radiation Laboratory,University of Science and Technology of China, Hefei 230029, China

Abstract: This paper describes the construction and the commissioning of the new injection bump system of HLS ring. An emphasis of the discussion is put on various errors of the system and the method of evaluation and reduction. After some improvements and fine adjustment, an average injection rate of 2—6mA/s was obtained in the daily operation and a maximum accumulated current of 400mA achieved. The injection system has run for almost two years and played an important role in the operation of the light source.