Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage
- Received Date: 2009-01-05
- Accepted Date: 1900-01-01
- Available Online: 2009-01-08
Abstract:
During the 1 st and 2 nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 months, and studied beam dynamics as well. In this paper, some beam dynamics studies on the storage rings and their preliminary results are given.