Stripping extraction calculation and simulation for CYCIAE-100

  • A 100 MeV H- compact cyclotron is under construction at China Institute of Atomic Energy (CYCIAE-100). The proton beams of 75 MeV-100 MeV at an intensity of 200 μA will be extracted in dual opposite directions by charge exchange stripping devices. The crossing point at the switching magnet center is fixed inside the magnet yoke and the stripping points for various extraction energies are calculated by the code CYCTRS. With the code GOBLIN, we can calculate the transfer matrix including the dispersion effects from the stripping point to the switch magnet. The beam distribution just after stripping foil can be obtained from the multi-particle tracking code COMA and the extracted beam parameters after the switch magnet such as emittance, envelope, dispersion, energy spread, bunch length, etc. are given by the extraction orbit simulations.

  • 加载中
  • [1] . ZHANG Tian-Jue et al. 100 MeV H- Cyclotron as an RIBDriving Accelerator, CYC 20042. Stripping extraction System for CYCIAE-100, CYCIAE Design note, 2006 (in Chinese)3. GOBLIN User Guide and Reference V3.3, TRI-CD-90-01,TRIUMF4. COMA-A Linear Motion Code for Cyclotron, Kost CJ, Mackezie G H. IEEE Transactions on Nuclear Science,1975, NS-22(3) June5. Baartman R. Linearized Equation of Motion in Magnet with Median Plane Symmetry, TRI-DN-05-06, Feb.4, 20056. Gordon M M. Part. Accel, 1984, 16: 397. Study of Stripping Efficiency for CYCIAE-100. AN Shi-Zhong et al. CIAE Annual Report, 20078. The Study of Optic Properties for H- Stripping ExtractionSystem in CYCIAE-cyclotron. XIAO Mei-Qing, ZHANGTian-Juan. FAN Ming-Wu. HEP NP, 1996, 20: 1110-1119. (in Chinese)
  • 加载中

Get Citation
AN Shi-Zhong, GUAN Feng-Ping, XIE Huai-Dong, WEI Su-Min, YAO Hong-Juan, BI Yuan-Jie, ZHONG Jun-Qing, JIA Xian-Lu, ZHANG Tian-Jue, LV Yin-Long, SONG Guo-Fang, JI Bin and GE Tao. Stripping extraction calculation and simulation for CYCIAE-100[J]. Chinese Physics C, 2009, 33(S2): 42-46. doi: 10.1088/1674-1137/33/S2/011
AN Shi-Zhong, GUAN Feng-Ping, XIE Huai-Dong, WEI Su-Min, YAO Hong-Juan, BI Yuan-Jie, ZHONG Jun-Qing, JIA Xian-Lu, ZHANG Tian-Jue, LV Yin-Long, SONG Guo-Fang, JI Bin and GE Tao. Stripping extraction calculation and simulation for CYCIAE-100[J]. Chinese Physics C, 2009, 33(S2): 42-46.  doi: 10.1088/1674-1137/33/S2/011 shu
Milestone
Received: 2009-01-05
Revised: 1900-01-01
Article Metric

Article Views(4870)
PDF Downloads(652)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Stripping extraction calculation and simulation for CYCIAE-100

    Corresponding author: AN Shi-Zhong,

Abstract: 

A 100 MeV H- compact cyclotron is under construction at China Institute of Atomic Energy (CYCIAE-100). The proton beams of 75 MeV-100 MeV at an intensity of 200 μA will be extracted in dual opposite directions by charge exchange stripping devices. The crossing point at the switching magnet center is fixed inside the magnet yoke and the stripping points for various extraction energies are calculated by the code CYCTRS. With the code GOBLIN, we can calculate the transfer matrix including the dispersion effects from the stripping point to the switch magnet. The beam distribution just after stripping foil can be obtained from the multi-particle tracking code COMA and the extracted beam parameters after the switch magnet such as emittance, envelope, dispersion, energy spread, bunch length, etc. are given by the extraction orbit simulations.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return