Operation Status of the BEPC 2002-2005

Get Citation
XING Jun, WEN Xue-Mei and Wang Xin-Hao. Operation Status of the BEPC 2002-2005[J]. Chinese Physics C, 2006, 30(S1): 69-71.
XING Jun, WEN Xue-Mei and Wang Xin-Hao. Operation Status of the BEPC 2002-2005[J]. Chinese Physics C, 2006, 30(S1): 69-71. shu
Milestone
Received: 2005-12-07
Revised: 1900-01-01
Article Metric

Article Views(2824)
PDF Downloads(578)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Operation Status of the BEPC 2002-2005

    Corresponding author: XING Jun,
  • Institute of High Energy Physics, CAS, Beijing 100049, China

Abstract: The Beijing Electron Positron Collider (BEPC) ended its running on July 4th 2005, after 17 years' running since the first collision in 1988. In order to realize the possibility that the BEPC can be run as a collider and as a light source in the same time, the paper describes the commissioning study of the parasitic mode with the permanent magnet wiggler 3W1 on the BEPC and the commissioning study of the in-vacuum wiggler 4W2.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return