Get Citation
WEI Su-Min, ZHANG Tian-Jue, XING Jian-Sheng, LI Zhen-Guo, CHU Cheng-Jie, WU Long-Cheng, JIA Xian-Lu, PAN Gao-Feng, GE Tao, XIE Huai-Dong, LÜ Yin-Long, HOU Shi-Gang, GUAN Feng-Ping, AN Shi-Zhong, ZHONG Jun-Qing, YANG Jian-Jun and YAO Hong-Juan. Beam Line Design and Construction of Gas Target for a 30MeV Medical Cyclotron[J]. Chinese Physics C, 2008, 32(S1): 77-79.
WEI Su-Min, ZHANG Tian-Jue, XING Jian-Sheng, LI Zhen-Guo, CHU Cheng-Jie, WU Long-Cheng, JIA Xian-Lu, PAN Gao-Feng, GE Tao, XIE Huai-Dong, LÜ Yin-Long, HOU Shi-Gang, GUAN Feng-Ping, AN Shi-Zhong, ZHONG Jun-Qing, YANG Jian-Jun and YAO Hong-Juan. Beam Line Design and Construction of Gas Target for a 30MeV Medical Cyclotron[J]. Chinese Physics C, 2008, 32(S1): 77-79. shu
Milestone
Received: 2008-01-10
Revised: 1900-01-01
Article Metric

Article Views(2742)
PDF Downloads(642)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Beam Line Design and Construction of Gas Target for a 30MeV Medical Cyclotron

    Corresponding author: WEI Su-Min,

Abstract: The first medical high intensity cyclotron CYCIAE-30 and its beam line for the isotope production were built in 1994 at China Institute of Atomic Energy. Now, an upgrading beam line system is designed based on the existing beam line of CYCIAE-30 to transport the beam extracted from the cyclotron to a gas target for the new isotope production, including elements location design, optics simulation and magnet design. The machining and installation of all the elements are accomplished based on the design. The beam tuning is finished and the transmission of 96.5% is obtained.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return