Status Report of the MS-ECRIS Construction

Get Citation
G.Ciavola1, S.Gammino1, L.Celona1, F.Consoli1, G.Gallo1, D.Mascali1, S.Passarello1, M.Cavenago2,
A.Galatà2, P.Spaedtke3, K.Tinschert3, R.Lang3, H.Koivisto4 and P.Suomin. Status Report of the MS-ECRIS Construction[J]. Chinese Physics C, 2007, 31(S1): 13-17.
G.Ciavola1, S.Gammino1, L.Celona1, F.Consoli1, G.Gallo1, D.Mascali1, S.Passarello1, M.Cavenago2,
A.Galatà2, P.Spaedtke3, K.Tinschert3, R.Lang3, H.Koivisto4 and P.Suomin. Status Report of the MS-ECRIS Construction[J]. Chinese Physics C, 2007, 31(S1): 13-17. shu
Milestone
Received: 2007-05-29
Revised: 1900-01-01
Article Metric

Article Views(1554)
PDF Downloads(1161)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Status Report of the MS-ECRIS Construction

  • Istituto Nazionale Fisica Nucleare-Laboratori Nazionali del Sud, Catania, 95123, Italy2 Istituto Nazionale Fisica Nucleare-Laboratori Nazionali di Legnaro, Legnaro, Italy3 Gesellschaft fur Schwerionenforschung mbH GSI, Darmstadt, Germany4 Department of Physics, University of Jyvaskyla JYFL, Jyvaskyla, Finland5 Grand Accelerateur National d'Ions Lourds GANIL, Caen, France6 Kernfysisch Versneller Instituut KVI, Groningen, Netherlands7 The Svedberg Laboratory TSL,Uppsala, Sweden8 CERN AB Department, Geneva, Switzerland9 CEA-DRFMC-SBT, Grenoble, France10 Nat.Inst.of Physics and Nuclear Engineering: NIPNE Bucharest, Romania

Abstract: The design of each component of the Multipurpose Superconducting ECR Ion Source (MS-ECRIS) has been completed and some items are ready. The magnets and the cryostat are under construction at ACCEL and the commissioning is scheduled for March 2007. The mechanical have been optimized and their construction is under way; the microwave system is under refurbishment and the 65kV power supply is available and upgraded for afterglow operations. Pumping and extraction system were adapted to the EIS testbench of GSI Darmstadt. The description of each part will be given in the paper along with a schedule of the forthcoming development and experiments.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return