Compensation-rematch for the major components of C-ADS injector-I

Get Citation
SUN Biao, YAN Fang, PEI Shi-Lun, MENG Cai and TANG Jing-Yu. Compensation-rematch for the major components of C-ADS injector-I[J]. Chinese Physics C, 2015, 39(11): 117003. doi: 10.1088/1674-1137/39/11/117003
SUN Biao, YAN Fang, PEI Shi-Lun, MENG Cai and TANG Jing-Yu. Compensation-rematch for the major components of C-ADS injector-I[J]. Chinese Physics C, 2015, 39(11): 117003.  doi: 10.1088/1674-1137/39/11/117003 shu
Milestone
Received: 2015-01-13
Revised: 2015-05-11
Fund

    Supported by National Natural Science Foundation of China (Projects 11235012, 11475201) and the China ADS Project (XDA03020000)

Article Metric

Article Views(1282)
PDF Downloads(22)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Compensation-rematch for the major components of C-ADS injector-I

    Corresponding author: TANG Jing-Yu,
  • 1. Institute of High Energy Physics (IHEP), Chinese Academy of Sciences, Beijing 100049, China
Fund Project:  Supported by National Natural Science Foundation of China (Projects 11235012, 11475201) and the China ADS Project (XDA03020000)

Abstract: The China-ADS project is a strategic plan launched by the Chinese Academy of Sciences to solve the nuclear waste problem and the resource problem for nuclear power in China. Under its long-term plan, it will last until about 2040. In order to achieve the extremely high reliability and availability required for the C-ADS accelerator, a fault tolerant strategy has been implanted. The failure effects of key elements such as the RF cavities and focusing elements in different locations of the injector-I part have been studied and schemes of compensation based on the local compensation-rematch method have been proposed. In addition, error analysis has been carried out to check the reliability of this method compared with the uncompensated situation, and it is found to be very effective. As the injector-I testing facility is coming into operation, it is possible to check and improve the compensation-rematch method with the beam testing experiment before the main linac operation.

    HTML

Reference (7)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return