Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage

Get Citation
QIN Qing, HUANG Nan, LIU Wei-Bin, LIU Yu-Dong, PENG Yue-Mei, QIU Jing, WANG Dou, WANG Xin-Hao, WANG Na, WANG Jiu-Qing, WEI Yuan-Yuan, WEN Xue-Mei, XING Jun, XU Gang, YU Cheng-Hui, ZHANG Chuang, ZHANG Yuan, ZHAO Zheng and ZHOU De-Min. Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage[J]. Chinese Physics C, 2009, 33(S2): 65-70. doi: 10.1088/1674-1137/33/S2/017
QIN Qing, HUANG Nan, LIU Wei-Bin, LIU Yu-Dong, PENG Yue-Mei, QIU Jing, WANG Dou, WANG Xin-Hao, WANG Na, WANG Jiu-Qing, WEI Yuan-Yuan, WEN Xue-Mei, XING Jun, XU Gang, YU Cheng-Hui, ZHANG Chuang, ZHANG Yuan, ZHAO Zheng and ZHOU De-Min. Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage[J]. Chinese Physics C, 2009, 33(S2): 65-70.  doi: 10.1088/1674-1137/33/S2/017 shu
Milestone
Received: 2009-01-05
Revised: 1900-01-01
Article Metric

Article Views(3564)
PDF Downloads(621)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Beam dynamics studies on BEPC-Ⅱ storage rings at the commissioning stage

    Corresponding author: QIN Qing,

Abstract: 

During the 1 st and 2 nd stages of the commissioning of the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), which started on Nov. 12, 2006 and Oct. 24, 2007, respectively, we got the luminosity one tenth of its design value, provided beams to synchrotron radiation users for about 4 months, and studied beam dynamics as well. In this paper, some beam dynamics studies on the storage rings and their preliminary results are given.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return